Shed Base Calculator UK
Work out the finished base size, concrete, MOT Type 1, paving slabs, excavation volume and waste allowance before you order materials for a garden shed.
Shed Base Material Result
Ready to order with allowance12 bags
For a 2.60 m by 2.00 m base, the concrete slab option needs about 0.56 m3 of concrete after allowance, plus about 0.84 tonnes of MOT Type 1.
2.60 m x 2.00 m
5.20 m2
0.98 m3
8%
0.56 m3
47 bags
0.84 tonnes
16 slabs
What The Shed Base Result Includes
The main answer is an order-focused quantity, not just a neat geometric area. A shed base fails when the ground is soft, the base is undersized, water cannot run away, or the order is a little short on the day. This page therefore shows the finished base size, the plan area, the excavation volume, the sub-base requirement, the slab or concrete amount and the waste allowance used.
The finished base size is the shed footprint plus the overhang on every side. A small overhang gives tolerance for wall panels, cladding, bearers and minor setting-out error. Too much overhang can hold water at the shed wall if the top surface is not finished well, so the result is a measuring aid rather than a design approval. For a timber shed, check the maker’s instructions for whether the bearers need full support, strip supports, a raised timber frame, a paving grid or a solid slab.
The concrete figure assumes a simple rectangular slab with one thickness. Real sites may need a deeper edge, a damp-proof detail, reinforcement, falls, a thickened apron or drainage channel. The MOT Type 1 figure uses an editable compacted density because product grading, moisture and compaction vary. If your supplier sells by bulk bag rather than loose tonne, ask for the actual filled weight and round up from the tonnage result.
How To Use The Shed Base Calculator
Measure The Shed Footprint
Use the outside footprint from the supplier drawing, not the internal floor area. If the size is shown as 8 x 6 ft, select feet so the tool converts the footprint to metres before adding the overhang.
Choose The Base Style
Select poured concrete, paving slabs or gravel grid. The calculator still shows all material lines, but the headline result changes to the material most likely to control your order.
Set Depths And Allowance
Enter compacted sub-base depth, slab or bedding depth, bag yield and waste. Use the bag label, supplier note or contractor quote where available.
Read The Purchase Lines
Use the rounded order numbers for buying and the unrounded volumes for checking a quote. Save the copied result with the product labels you plan to buy.
Shed Base Formula And Rounding
Base length in m = shed length in m + 2 x overhang in m.
Base width in m = shed width in m + 2 x overhang in m.
Base area in m2 = base length x base width.
Concrete volume in m3 = base area x concrete depth in m x allowance factor.
Sub-base volume in m3 = base area x sub-base depth in m x allowance factor.
MOT tonnes = sub-base volume x compacted density.
Concrete bags = concrete volume / bag yield, rounded up.
Paving slabs = base area / slab area x allowance factor, rounded up.
Rounding is deliberately practical. You cannot buy part of a bag or part of a slab, so the calculator rounds those items up. It keeps cubic metre and tonne values to two decimals because those are useful for comparing a bulk delivery or a contractor’s quote. If your supplier sells MOT Type 1 in 850 kg bulk bags, divide the tonne result by 0.85 and round up; if it sells loose by the tonne, keep the tonne line.
Shed Base Worked Examples
| Project | Inputs | Result To Check | Why It Matters |
|---|---|---|---|
| Small 6 x 4 ft shed | Feet selected, 100 mm overhang, 75 mm MOT, 75 mm paving bedding, 8% allowance. | The paving slab count and MOT tonnage are likely to drive the order. | A small shed still needs a level base. The overhang stops the wall sitting right on the edge. |
| Medium 8 x 6 ft shed on concrete | 2.4 m by 1.8 m shed, 100 mm overhang, 100 mm slab, 75 mm MOT, 0.012 m3 bag yield. | The concrete bag count may look high because small ready-mix bags yield limited mixed volume. | This tells you whether bagged concrete is sensible or whether a small ready-mix delivery deserves a quote. |
| Large 10 x 8 ft workshop | Feet selected, 150 mm overhang, 100 mm slab, 100 mm MOT, 10% allowance. | The excavation volume, access route and handling load become more important than the neat area. | Large bases create heavy deliveries. Plan barrow access, spoil removal and help with lifting. |
| Gravel grid base | Gravel style selected, 100 mm overhang, 75 mm sub-base, shallow top layer entered as slab depth. | Read the sub-base and excavation lines first, then check the grid maker’s infill coverage. | Grid systems vary by product. The calculator sizes the footprint and base layer, not every brand detail. |
Common Shed Sizes And Base Areas
| Shed Label | Approx Footprint | Base With 100 mm Overhang | Base Area | Planning Note |
|---|---|---|---|---|
| 6 x 4 ft | 1.83 m x 1.22 m | 2.03 m x 1.42 m | 2.88 m2 | Usually a light garden store, but still needs a firm and level support. |
| 8 x 6 ft | 2.44 m x 1.83 m | 2.64 m x 2.03 m | 5.36 m2 | Check door swing, gutter overhang and the route from gate to base. |
| 10 x 8 ft | 3.05 m x 2.44 m | 3.25 m x 2.64 m | 8.58 m2 | Material handling becomes a real job; consider loose delivery or contractor mixing. |
| 12 x 8 ft | 3.66 m x 2.44 m | 3.86 m x 2.64 m | 10.19 m2 | Check planning, boundary height, access and drainage before work starts. |
Ground, Drainage And Safety Checks
Level And Fall
A shed base should be level enough for the frame to sit without twist, but the surrounding ground should not send water back under the shed. If the site is on a slope, measure from the highest corner and plan the excavation before ordering.
Manual Handling
Concrete bags, slabs and aggregate are heavy. Split deliveries into safe lifts, use a barrow route that will take the load, and get help where needed. The calculator shows quantity, not whether a lift is safe for you.
Planning Boundary
Outbuilding rules differ by site and country. Planning Portal guidance for England notes height, boundary, designated land and listed-building limits. Contact the local planning authority when the position or use is uncertain.
When This Calculator Is Not Enough
Do not rely on this calculator alone for a habitable annexe, a workshop with heavy machinery, a concrete slab tied into another structure, poor ground, nearby drains, tree roots, flood risk, a listed building, a flat or maisonette, or a site with planning restrictions. In those cases the base is part of a wider building, drainage and legal decision.
Also check the manufacturer’s base instructions. Some metal sheds need a flat slab, some timber sheds prefer raised bearers, and some plastic sheds use their own floor grid. A base that is mathematically large enough can still be wrong if it traps water against the panels, blocks airflow under a timber floor or leaves fixing points unsupported.
Shed Base Calculator FAQ
How much bigger should a shed base be than the shed?
A common starting point is 50 to 100 mm beyond the shed footprint on each side, but the correct amount depends on the shed design and how water will run away from the walls. The calculator lets you edit the overhang so you can follow the supplier’s detail.
Should I use concrete, paving slabs or a gravel grid?
Concrete suits heavier sheds and workshops when it is detailed properly. Paving slabs can suit small and medium sheds on well-prepared ground. Gravel grid systems can help drainage, but product rules differ. Use the calculator to size materials, then match the choice to ground, load and manufacturer guidance.
Why is the concrete bag count so high?
Small bags do not make much mixed concrete. If the result shows many bags, compare the bagged cost and labour with a small ready-mix delivery or a hired mixer. The cubic metre line helps you ask for quotes using the same volume.
Does the MOT Type 1 figure include compaction?
The tool uses an editable compacted density. Real tonnage changes with moisture, grading and how firmly the layer is compacted. If your supplier gives a better density or coverage figure, enter it in the density field.
Can I put the shed straight onto soil?
That is rarely a good long-term plan. Soil moves, holds moisture and makes a level floor difficult. A prepared base spreads load, reduces rot risk and helps doors and panels stay square.
Does this page decide planning permission?
No. It calculates material quantities only. Outbuilding planning rules depend on height, location, use, boundaries, designated land, listed-building status and local controls. Check the local planning authority if the shed is large, close to a boundary or not purely incidental to the home.
Sources
- Planning Portal. (n.d.). Outbuildings: Planning Permission. Planning Portal. https://www.planningportal.co.uk/permission/common-projects/outbuildings/planning-permission/
- Health and Safety Executive. (2024). Manual Handling at Work. HSE. https://www.hse.gov.uk/msd/manual-handling/index.htm
- British Standards Institution. (2023). BS 8500 Concrete: Complementary British Standard to BS EN 206. BSI.
- Department for Levelling Up, Housing and Communities. (2019). Permitted Development Rights for Householders: Technical Guidance. GOV.UK. https://www.gov.uk/government/publications/permitted-development-rights-for-householders-technical-guidance